Exercise - Root Cause Draft for Client
- Due Oct 10, 2023 at 5pm
- Points 100
- Available Sep 26, 2023 at 8am - Oct 11, 2023 at 5pm
This assignment is part of the module Oct 10 - Work Day and hasn't been unlocked yet.
Completion Prerequisites
The following requirements need to be completed before this page will be unlocked:Rubric
Please include a title
Keep in mind that 96 students have already been assessed using this rubric. Changing it will affect their evaluations.
Criteria | Ratings | Pts |
---|---|---|
Was "template" text removed from Root Cause Mural template?
threshold:
pts
|
pts
--
|
|
Is there a clear chain between symptoms, problems, and root cause?
threshold:
pts
|
pts
--
|
|
Do potential solutions address the root cause?
threshold:
pts
|
pts
--
|
|
Do objectives align to root cause and solution in a relevant way?
threshold:
pts
|
pts
--
|
|
Are all performance criteria are measurable?
threshold:
pts
|
pts
--
|
|
Did they do a thorough job noting all relevant constraints? Are constraints specific?
threshold:
pts
|
pts
--
|
|
Are symptoms not being confused for problems or root causes?
threshold:
pts
|
pts
--
|
|
Are problems not being confused for symptoms or root causes?
threshold:
pts
|
pts
--
|