Exercise - Risk Management (in-class exercise)
- Due No due date
- Points 100
This assignment is part of the module Day 9 - (Sep 19) Risk Management and hasn't been unlocked yet.
Completion Prerequisites
The following requirements need to be completed before this page will be unlocked:Rubric
Please include a title
Keep in mind that 77 students have already been assessed using this rubric. Changing it will affect their evaluations.
Criteria | Ratings | Pts |
---|---|---|
Each risk criteria was correctly interpreted
Comments and score reflect they understood the criterion properly
threshold:
pts
|
pts
--
|
|
A rating is provided for each criteria (yes, maybe, no)
threshold:
pts
|
pts
--
|
|
A comment describing how the criterion was evaluated is included for all criteria
threshold:
pts
|
pts
--
|
|
The rating of each criterion aligns with the criterion evaluation (e.g. if "yes", the evaluation indicates the criterion is a risk)
threshold:
pts
|
pts
--
|
|
For each criterion that has a rating of "yes" or "maybe", risk mitigation and/or next steps/questions are provided
threshold:
pts
|
pts
--
|
|
The risk mitigation and/or additional questions provided are appropriate and align with the criterion evaluation
threshold:
pts
|
pts
--
|